推广 热搜: 电厂  发电  物资  煤炭  广西  河北    施工  变压器  输送机 

三亚市吉阳东片区城市设计方案国际征集资格预审公告

   日期:2021-09-27     来源:中国电力招标采购网    作者:dlztb    浏览:0    
核心提示:三亚市吉阳东片区城市设计方案国际征集资格预审公告 International Call for Proposals on Urban Design for Jiyang East Sectio

三亚市吉阳东片区城市设计方案国际征集
资格预审公告

International Call for Proposals on Urban Design for Jiyang East Section of Sanya City

Announcement on Prequalification

为贯彻落实习总书记“4·13”重要讲话、中央12号文件精神,围绕海南“三区一中心”的战略定位,按照市委、市政府《三亚市城市规划建设管理提升三年(2021-2023年)行动实施方案》的工作部署,以推动高质量发展和创造高品质生活为宗旨,提升三亚市吉阳东片区的城市综合服务功能,提升片区发展活力和核心竞争力,更好地塑造片区城市形象,科学谋划片区建设发展,提升城市居民生活幸福感,三亚市人民政府特此组织开展三亚市吉阳东片区城市设计方案国际征集活动。

The Sanya Municipal People's Government hereby organizes and carries out the International Call for Proposals on Urban Design for Jiyang East Section of Sanya City, in order to implement the guiding principles of General Secretary Xi's important speech made on "April 13"  and Official document No. 12 of the Central Government, and to put through the work deployment of the municipal Party Committee and the municipal government's Three-year Action Implementation Plan for Improving Sanya's Urban Planning, Construction and Management (2021-2023)", centering around Hainan's strategic positioning of "three sections and one center," with the purpose of promoting high-quality development and creating high-quality life, and with efforts to enhance the comprehensive urban service function of Jiyang East Section of Sanya City, to strengthen the vibrancy of growth and core competitiveness of the section, to better shape the urban image of the section, to scientifically plan the construction and development of the section, and to improve the happiness of urban residents.

吉阳东片区是三亚中心城区连接东部度假湾区和北部山地生态区的重要交通枢纽。本次城市设计方案国际征集通过汇聚全球智慧,聚焦三亚吉阳东片区,落实“山水林田湖草海”生命共同体理念,首次将国土空间全要素纳入城市设计范围,科学布局生产、生活和生态全域空间,将片区打造成为生态共享、产城融合、品质生活的美好家园。

Jiyang East Section is an important transportation hub connecting the eastern resort Bay area and the northern mountainous and ecological area in Sanya's city center. This International Call for Proposals on Urban Design will gather global wisdom to focus on Sanya's Jiyang East Section, and implement the concept of community of life featuring "mountains, waters, forests, fields, lakes and grassland and the sea", and for the first time, all components of national territory and space have been included into the scope of urban design, where a scientific layout of production, the entire living and ecological space will turn the section into a beautiful homeland with shared ecological resources, integrated production and city, and of high quality life.

本次方案征集采用公开征集的方式进行,邀请国内外具有相关规划设计经验的设计机构报名申请应征,第一步通过资格审查的方式(预审)确定4个应征人,第二步由通过资格审查的应征人根据征集文件的要求编制规划设计方案。

The Call for Proposals will be rolled out in an open call, by inviting design institutions at home and abroad with planning and design experiences in similar projects to apply for prequalification. The first step will determine 4 applicants through Review for Qualifications (prequalification), and in the second step, the applicants who have passed the Review for Qualifications will propose the planning and design schemes according to the requirements of the documents of the Call.

一、项目概况

I. Project Brief

1.项目名称:三亚市吉阳东片区城市设计方案国际征集。

1. Project name: International Call for Proposals on Urban Design for Jiyang East Section of Sanya City

2.项目选址及规划范围:吉阳东片区位于三亚市中心城区东北部,东临“国家海岸”海棠湾,南接亚龙湾国家旅游度假区,西至学院路,北至保亭县,面积约80.72平方公里。其中需详细设计的片区有3个,分别为原吉阳镇区、南丁片区、大茅-中廖片区,总规划面积约2832公顷(详见规划范围示意图)。

2. Project Siting and Planning Scope: Jiyang East Section is located in the Northeastern part of Sanya's downtown area, adjacent to Haitang Bay, the "National Coast" in the East, and the Yalong Bay National Tourism Resort in the South, Xueyuan Road in the West and Baoting County in the North, with an area of about 80.72 square kilometers. Among them, 3 sections need to be designed in detail- respectively the former Jiyang town section, Nanding section and Damao-Zhongliao section, with a total planned area of about 2,832 hectares (see the Schematic Diagram of Planning Scope for details).

规划范围示意图

Schematic Diagram of Planning Scope

3.征集方式:公开征集。

3. Method of Call: Open Calls

4规划设计内容:包括两个层面,即总体城市设计和详细城市设计。

4. Content of Planning and Design: it includes two levels, namely master urban design and detailed urban design.

① 总体城市设计层面

① Master Urban Design

总体城市设计范围:东临“国家海岸”海棠湾,南接亚龙湾国家旅游度假区,西至学院路,北至保亭县,面积约80.72平方公里(详见规划范围示意图)。

Master urban design scope: it is adjacent to Haitang Bay, the "National Coast," in the East, to Yalong Bay National Tourism Resort in the South, to College Road in the West and to Baoting County in the North, with an area of about 80.72 square kilometers (see the Schematic Diagram of Planning Scope for details).

设计内容:包括但不限于从区域宏观层面出发,探索城乡融合发展,明确吉阳东片区的发展目标愿景和总体定位,开展产业研究和功能策划,以构建“山、河、林、田、城、村”生态空间格局为目标,谋划顺应自贸港发展趋势的功能空间布局。对城市总体景观风貌、综合交通、公共服务设施及基础设施配套、开发时序等方面进行研究。

Content of Design: it includes but is not limited to exploring the integration of urban and rural development from the regional macro level, clarifying the development target vision and overall positioning of Jiyang East Section, carrying out industrial research and functional planning, aiming at building the ecologically spatial pattern of "mountains, rivers, forests, fields, cities and villages," and planning the functional spatial layout that conforms to the development trend of the free trade port. The overall landscape, style and features of the city, comprehensive transportation, public service infrastructure and supporting facilities, development sequence and other aspects shall be studied.

② 详细城市设计层面

② Detailed Urban Design

详细城市设计包括3个片区,总面积约2832公顷。其中,原吉阳镇片区面积约1130公顷,南丁片区约326公顷,大茅-中廖片区约1376公顷(详见规划范围示意图)。

The detailed urban design covers three sections with a total area of about 2,832 hectares, where the former Jiyang town section measures about 1,130 hectares, the Nanding section about 326 hectares, and the Damao-Zhongliao section about 1,376 hectares (see the schematic diagram of the planning scope for details).

设计内容:包括但不限于以总体城市设计为基础,细化详细设计片区定位与功能业态,合理优化完善用地布局、交通组织、公共服务设施及基础设施配套,创新空间组织和形态风貌,处理重要节点和重要界面,对详细设计范围进行重点设计、确立各片区鲜明形象等方面内容,并形成城市导控和实施建议。

Content of Design: it includes but is not limited to refining the positioning and functional types of the detailed design section based on the master urban design, reasonably optimizing and improving the land use layout, transportation organization and public service infrastructure and supporting facilities, innovating the spatial organization and modality style, polishing important nodes and interfaces, focusing on the detailed design scope, establishing the distinct image of each section, and forming suggestions on urban guidance, control and implementation.

5设计周期:应征阶段规划设计周期为75天。计划在2021年10月22日

未曾在中国电力招标采购网(www.dlztb.com)上注册会员的单位应先注册。登录成功后根据招标公告的相说明下载招标文件!

项目 联系人:李杨  
咨询电话:010-51957458 
传真:010-51957412 
手机:13683233285 
QQ:1211306049 
微信:Li13683233285 邮箱:1211306049@qq.com

备注:欲购买招标文件的潜在投标人,注册网站并缴纳因特网技术服务费后,查看项目业主,招标公告,中标公示等,并下载资格预审范围,资质要求,招标清单,报名申请表等。为保证您能够顺利投标,具体要求及购买标书操作流程按公告详细内容为准,以招标业主的解答为准本。

来源:中国电力招标采购网 编辑:bkpmzb
 
打赏
 
更多>同类资讯

最新资讯
最新行情
网站首页  |  关于我们  |  联系方式  |  使用协议  |  版权隐私  |  网站地图  |  排名推广  |  广告服务  |  积分换礼  |  网站留言  |  RSS订阅  |  违规举报  |  京ICP备12017752号-21